03.01.11 - Noventis – 8 Locations in the InterlakeWhen several credit unions in the Interlake merged the result was Noventis Credit Union. To complete this unity, new signage needed to be provided for all their branches. Once the job was awarded to us, we set out in phases as the permits came in – the first (and current) phase as all the building signage and the second phase as all the pylons. The building signage is various sizes of the same construction of channel letters and logo with a small push thru box. The pylon signs all have the new identification panel with a full color 20mm message centre that will be linked and controlled centrally.
03.01.11 - Tetra Tech – Winnipeg, MBAt this location an 8' logo with 4' channel letters will be installed on the eighth floor of a hi-rise building. You'll be seeing some action there soon!
03.01.11 - Assiniboine Credit Union – 200 Main Street Winnipeg, MBTwo sets of channel letters – one at 9'2" and the other at 8'0" - will be installed on the sixth floor exterior at 200 Main Street. These custom channel letters are specially formulated to provide exact color matches during the day and superior illumination at night. This will be installed in the near future.
03.01.11 - City of Winnipeg Water Treatment Plant – Deacon's CorneBeing the successful bidder on this City project we immediately set to work getting our drawing approved & engineer stamped. This freestanding structure is double sided with digital print graphics and internally illuminated with LED. Installation should be completed by the end of March.
03.01.11 - 03.01.11 - Motel 6 – Headingly, MBThis project has a large single pole pylon with a LED digital rate display, flex face building signs illuminated with LED, and the building glass tower illuminated with LEDs as well. This project will be completed in the beginning of March.
03.01.11 - Safeway – 1441 Henderson Hwy, Winnipeg, MBAs the successful bidder on this project, we will be providing a 30' pylon sign with multiple tenants for Safeway. We will be working closely with the GC and their trades to ensure that the proper electrical requirements are met and the site conditions are prepared as needed. The scheduled completion for this project will be in September 2011.
03.01.11 - Westoba Credit Union – Winnipeg, MBSignex will be providing building signage, directional parking lot signs, interior wayfinding and etched privacy vinyl on windows. This project will be completed in late summer.
03.01.11 - MTS Connect – Winkler & Steinbach, MBCustom formed channel letters with a specially formulated digital print process to provide exact color matches during the day and superior illumination at night. As well, we provide interior signage for all their new and refurbished sites.
03.01.11 - Variety Heritage Adventure Park (VHAP) – the Forks, Winnipeg, MBSignex is supplying a plethora of signature signage at this federally funded park. We are utilizing a variety of materials and textures for all types of signage. From providing the enclosure material for the tipi to custom styled theatre shed to turn of the century posts and bases. A unique project from start finish – and Signex is thrilled to be a part of it!